OSM-Transform Project: Weekly Report 0

STATUS

We had a phone call with Benjamin on Friday, to discuss where I was regarding to schedule, and to discuss the preliminaries of UI mockup. We are slightly behind schedule in that the UI mockup should probably have been completed last week, so hopefully by the middle of this week this should be sorted out. The question posed to Benjamin was whether or not this would be Java Swing-based or whether would be web-based, the consensus being that since this was an addition to WPS, it would probably have to be web-based.

PROBLEMS

So one problem that prevented work from getting done this weekend was sporadic power outages in the Waterloo region. There were some work lost as various parts of campus and residences either cycled power at various points of the day, or lost power for several hours, which was rather unfortunate. This was extremely unusual, and also highly frustrating. It is also a holiday today (Victoria Day).

TODO FOR THE WEEK

As per the schedule, the TODO for this week would be to flesh out the preliminaries of that UI mockup (and get feedback from Benjamin and/or other parties). This will probably be put on the wiki somewhere. Also the other TODO for this week is to start committing code to the repository, basically as a skeleton structure for the different components of the project.

About these ads
This entry was posted in GSoC 2012. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s